Internal Development Build 0.225.0.58 - Mmm, that new flooring smell.

• D/E/F/G Decks, Ring 0 - Re-modelled all 3 versions of the stairs in the reactor room so that they fit the new deck heights. • D/E/F/G Decks, Ring 0 - Added new spline-driven railings to the new stairs. • F/G Decks, Ring 1 - Designed and modelled 4 new rubber floor panels. (They are similar to the old ones, just more detailed) • F Deck, Ring 2 - Designed and modelled 1 new rubber floor panels. • F Deck, Rings 1/2 - Added numerous new socket-based connection points around for the new floor panels. • F Deck, Rings 1/2 - Fleshed out more of the structural framework pieces. [img]{STEAM_CLAN_IMAGE}/40608420/21974fe41079b8a2c92d4b35873c9a748e73dfcc.jpg[/img]