New Steam Turbine

[b]Improvements and fixes:[/b] [list] [*] Added a new steam turbine model. More info at https://nuclearesgame.blogspot.com/2024/06/changes-in-turbine-building.html [*] Added new electric turbines (one for each loop). [*] Added a selector to the synchroscope to select the turbine to be synchronized. [*] Added meters for the new turbines in the power generation control station. [*] Added a level to the turbine building to accommodate the new steam turbines. [*] Added a new floor to the main building to connect the main corridor with the new level of the turbine building. [*] Added a new floor to the elevator. [*] Adjusted the generation and demand hertz from 51 to 50. [*] Adjusted the turbine compensator to work within a wider variation range. [*] Adjusted Apprentice mode so that resistance banks are not damaged during guided instruction. [*] Separated the steam turbines (one for each loop). [*] Fixed the bug with trophies for successful audits when there is no space in the display cases to store them. [*] Fixed the bug in label "Speed limited by wear or damage". [*] Fixed the bug of the M03 valve that could not be activated without climbing into the container. [*] Fixed the bug in the dosing pump, which did not continue dosing boron when loading a saved progress. [*] Fixed the bug in Apprentice mode, where the synchroscope did not detect that it was synchronized and did not allow that step to be advanced. [/list] This update is compatible with all previous savegames. If you're having trouble loading a saved progress, please let me know! We are waiting for you in the game's Discord!